2023 Team

2023 Team
The 2023 Team

Saturday, March 31, 2012

Dateline: Mountain Top Central

Hello to all.  It is currently 0815 hours on Saturday 31 March 2012 and I am sitting on 6 bricks up on the top of the mountain in El Picacho where the well will be built, starting either later today or no later than Monday.  The Gehlen team is hauling bags of sand up to this location so that when we get the 96 pound bags of cement here the foundation for the 10,000 gallon tank can begin.

The exact location 14 46'54.6" N and 87 28'37.8".  The altitude is 1496 meters.  We have a thermometer with us and we will be able to capture the exact temperature on this mountain top where the team is working.  Just like the 2nd house in Nuevo Capital, there is no shade.  The team is hauling the bags of sand up the mountain in an assembly fashion through a coffee field  We will be sending photos as soon as my camera gets here.  You can tell I am working really hard sitting on these bricks (carried up here yesterday) typing this message.  Life is really tough for me!  We will watch the kids real close today because it is really hot.  They will drink water and water mixed with gatorade.

Mr. Francis

2 comments:

  1. Thank you Mr. Francis for all you do for the people of Honduras. You truly are a blessing.

    Thanks for keeping the missioners safe
    God Bless you Take Care
    The Begnoche Family

    ReplyDelete
  2. Good job Frank. It's nice to see you are still a hard worker!
    The Loutschs

    ReplyDelete